Gold Wash Plant for Ghana

Trommel wash plants engineered for Ghana's laterite clay alluvial deposits. Ashanti & Western Region ready. CE + ISO9001. Ships in 25 days.

Engineered for Ghana Laterite Clay

Ghana's Ashanti and Western Region alluvial deposits contain high-clay laterite ore that standard wash plants cannot process efficiently. Our dual-stage trommel scrubbers are specifically designed to break down sticky Ghana clay before gold recovery, achieving 92–96% recovery rates.

Shipping to Tema Port

Production: 25 days from order confirmation. Ocean freight Shanghai to Tema: 21–25 days. Total door-to-port: 45–55 days. We provide full export documentation and CE certification required for Ghana mining operations.

Recommended Equipment

FAQ

What is the price of a gold wash plant?

Our gold wash plants start from $6,500 FOB for a 5-20 TPH portable unit. A 50-100 TPH scrubber trommel wash plant starts from $22,000 FOB. Prices depend on capacity, configuration, and accessories. Contact us for a free custom quotation.

How long does shipping take to Ghana / Australia?

Production takes 25 days from confirmed order. Ocean freight from Shanghai to Tema (Ghana) is 21-25 days. To Australia (Brisbane/Fremantle) is 18-25 days. Total door-to-port is typically 45-55 days.

Are your plants CE certified?

Yes. All Downunder-4Gold equipment is CE certified and manufactured under ISO 9001:2015 quality management system. Full certification documentation is provided with every shipment.

Do you provide complete turnkey sets?

Yes. Every set includes: trommel or shaker deck, sluice boxes, gold carpet, water pump, concentrators, shaking table, electrical panel, and starter spare parts pack.

Quote for Ghana

Write to us